Pilot Building Selection: Shortlist
10–2023
︎ Plan types
︎ Fact sheets
︎ Opportunities
Split plan with embedded fire stairs.
Rectangular plan with fire stairs on ends.
Square plan with scissor fire stairs.
Atypical plans.
A: Rosemont
3855 boulevard Rosemont, MontréalBuilt: Avril 1971
Occupants: Families, couples, people living alone Seniors
Floors: 6
Dwellings: 82 units
Average Disrepair: IVP – B, 9%
Recent Renovations:
- Travaux de chaufferie 2018
- Travaux de mieux isoler (2016) $300 000
(Link to OMHM Directory Page)
B: Berri-Lajeunesse
9550 rue Lajeunesse, MontréalBuilt: Mai 1973
Occupants: Seniors
Dwellings: 109 units
Floors: 10
Average Disrepair: IVP – E, 42.5%
Recent Renovations:
- Travaux sur le toit (2021)
- Travaux Incendies (2016)
- Travaux sécurisé les facades $383 000 (2015)
(Link to OMHM Directory Page)
C: Saint-André
920 - 950 rue Robin, MontréalBuilt:
Décembre 1969
Occupants: Families, couples, people living alone, Seniors
Dwellings: 111 units
Floors: 12
Average Disrepair: IVP – B, 8.7%
Recent Renovations:
(Link to OMHM Directory Page)
D: Favard
2066 Rue FavardBuilt:
Novembre 1976
Occupants: Seniors
Dwellings: 109 units
Floors: 8
Average Disrepair: IVP – C, 14.3%
Recent Renovations:
- Travaux amiante (2015)
- Travaux de masonrie $160 000 (2013)
- Travaux de système d’alarme (2013)
(Link to OMHM Directory Page)
E: Cartier-Chabot
1901 rue Gilford, MontréalBuilt:
Mars 1970
Occupants: Families, couples, people living alone
Dwellings: 55 units
Floors: 7
Average Disrepair: IVP – C, 13.3%
Recent Renovations:
- Travaux d’aggrandissement de cuisine et buanderie (2009) $700 000
(Link to OMHM Directory Page)